Click to go to the County Commissioners districts page

Click For State Of Minnesota Website


Highway Department

 

This dept. oversees the design, construction, maintenance, and operation of all County and County State Aid Highways (CSAH) and bridges.  In addition to the main shop/truck station in Fairmont, truck stations are also located in Dunnell, Trimont and Truman.  There are 172 bridges and approximately 510 Miles of County and CSAH roads in Martin County, of which 270 miles are paved, and 240 miles are gravel.

   

1200 Marcus St

Fairmont, MN  56031

Phone: 507-235-3347  Fax: 507-235-3689

 
 

County Engineer

 
Kevin Peyman
e-mail:  kevin.peyman@co.martin.mn.us
 

 

Assistant County Engineer

 
Gary Schaub
 

      

Accountant/Office Manager

 
Jill Redenius
e-mail: jill.redenius@co.martin.mn.us
 
 

 
MARTIN COUNTY TEN YEAR CONSTRUCTION PLAN/BONDING LIST
 
 
County Road Construction Projects
 
To view the Projects, Plan Holder List or Bid Results you will need Adobe Reader Version 5 or latter.
Click on icon below to get Adobe Reader if you do not have it.
Get Adobe Acrobat image
 

2009 Construction / Maintenance Projects

Project Sealed bids will be received by
 

SAP 46-599-71 and SAP 46-599-72

 

Grading and Bridge Replacemnts (Notice to Contractors) 

August 28, 2009 at 10:00 am.

Proposal
SAP 46-599-71 Abbrev. Plans
SAP 46-599-72 Abbrev. Plans
SAP 46-626-20  

Aggregate Shouldering (Notice to Contractors) 

July 2, 2009 at 10:00AM

Proposal

Partial Plans for SAP 46-626-20

SAP 46-650-07 and SAP 46-639-11  

Bituminous Overlays (Notice to Contractors) 

July 2, 2009 at 10:00AM

Proposal

Plans for SAP 46-639-11

Plans for SAP 46-650-07

C.P. 09:04  

Highway Pavement Striping (Notice to Contractors) 

July 2, 2009 at 10:00AM

Highway Pavement Striping (Proposal)

C.P. 09:01  

Supplying Bituminous Material for Sealcoating

June 12, 2009 - 10:00 a.m.

Notice to Suppliers

Proposal for C.P. 09:01

S.P. 46-636-03  

Aggregate Base and Shouldering and Bituminous Base, Binder and Wear

May 29, 2009 at 10:00 a.m.

Notice to Contractors

Proposal for SP 46-636-03

Plans for SP 46-636-03

 

Plan Holder List

Letting

Planholder list for SAP 46-599-71 and SAP 46-599-72

Aug 28, 2009 at 10:00 a.m.

Planholder List for SAP 46-626-20 (Aggregate Shouldering)

July 2, 2009 at 10:00AM

Planholder List for SAP 46-639-11 and SAP 46-650-07

July 2, 2009 at 10:00AM

Planholder List for CP 09:04

July 2, 2009 at 10:00AM

Planholder List for CP 09:01

June 12, 2009 - 10:00 a.m.

SP 46-636-03 - Bituminous Wear and Non-Wear Aggregate Base & Shouldering

May 29, 2008 - 10:00 a.m.

C.P. 09:08 - Maintenance Gravel Production

May 15, 2009 at 10:00 a.m.
 

 

Bid Results 2008 - 2009

SAP 46-599-71 and SAP 46-599-72 - Grade and Bridge Replacements
 
Bid Results C.P. 09:04 Highway Pavement Striping
Bid Results SAP 46-626-20 Aggregate Shouldering
 Bid Results SAP 46-639-11 and SAP 46-650-07 Bituminous Wear and Non-Wear aggregate Base & Shouldering
Bid Results CP 09:01
 
Bid Results for SP 46-636-03
 
Bid Results for the Maintenance Gravel Production C.P. 09:08
 
Bid Summary on Farm Land
 
C.P. 08:04  Highway Pavement Striping
 
C.P. 08:01 Bituminous Material
 

Bid Results for 2000 Sterling Tandem LT-7500 Truck

 
Bid Results for SAP 46-636-02
 

 

Equipment For Sale

 

 

 

 

 

On Line Forms
 
Oversize/Overweight Permit
Application for Utility Permit
 
 

 

MAPS
 
To view the maps below you need Adobe Acrobat Reader

 
Map of cities in the county - 1.6MB file
 
2010 Road Load Limits
PDF Jpeg
Road Load Limits Road Load Limit